1. New Hardware
- 2U Server
PowerEdge 2970 or similar class machine
- User accessible services
- 1U managed switch
2. Removed Hardware
- Mire
- Hopper
- Netgear switch
3. Space Change
- 0U
- Free up 1 port on the switch
- Remove mire
- Remove hopper
- Add new machine
- Free up 1 port on the management console
- Add new machine
- Remove mire SP
- Remove hopper RSA
We might want to keep the netgear switch to slave to the console server. A managed switch, however, would also offer vlan support and it looks like a port based management vlan could be used (as long as the vlan ID on the console and switch agreed).