welcome: please sign in

Diff for "OnSiteVisits"

Differences between revisions 6 and 7
Revision 6 as of 2010-03-06 06:32:02
Size: 615
Editor: RichardDarst
Comment: add descriptions of what happenned each day
Revision 7 as of 2010-12-23 02:26:11
Size: 1325
Editor: noway
Comment: fritz KVM cables stuff
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
 * 2010-12-22 - Installed KVM cables for fritz. Cabinet is packed, organizing cables would be nice but not necessary right now.
 * 2010-12-08 - Went to install KVM cables, but the VGA cable had the wrong gender on one end. rkd noticed that one drive in deleuze had failed. Ey pulled and re-inserted the drive, and clinton fiddled with megaraid, and it worked again (still working as of the next visit). clinton is monitoring via megaraid software.
Line 10: Line 12:
 * KVM cables for fritz. Ensure in general that all machines can be accessed.
Line 14: Line 15:
 We could do this by only pulling all KVM related cables only and reinserting them in a more organized manner (wouldn't require downtime).
Line 16: Line 18:
(to do)  * In the back (south side) of the room, there is a public room of various supplies. There's a small router with DHCP as well as various tools for your use. Occasionally you can find useful parts here.

1. Visits

  • 2010-12-22 - Installed KVM cables for fritz. Cabinet is packed, organizing cables would be nice but not necessary right now.
  • 2010-12-08 - Went to install KVM cables, but the VGA cable had the wrong gender on one end. rkd noticed that one drive in deleuze had failed. Ey pulled and re-inserted the drive, and clinton fiddled with megaraid, and it worked again (still working as of the next visit). clinton is monitoring via megaraid software.
  • /20100130 - shrink partitions on fritz's disks

  • /20100105 - install fritz

  • /20090821 - get hopper working, plus other cleanup.

  • /20080423

2. To do, someday

  • Move mire and hopper down by fractions of a U to free up 1U extra space in the cabinet.
  • rkd should get his lenny cdrw back sometime.
  • (pipe dream) clean up the mess of cables in the back. Probably not worth doing unless we shut everything down. Nothing is broken now. We could do this by only pulling all KVM related cables only and reinserting them in a more organized manner (wouldn't require downtime).

3. Peer1 facility information

  • In the back (south side) of the room, there is a public room of various supplies. There's a small router with DHCP as well as various tools for your use. Occasionally you can find useful parts here.

OnSiteVisits (last edited 2014-04-16 18:38:33 by ClintonEbadi)